Smoke Control Case Study

Often, the most difficult component to provide is Smoke Control. The smoke control system must be engineered specifically for each project and can vary greatly depending on the layout of an atrium and the fire hazards contained therein. The goal of the smoke control system is to maintain a tenable environment for building occupants. This typically includes maintaining the smoke layer 6’ above the highest occupied floor for 20 minutes.